29. Time for British Rail 2.0? & Jacobite steam train fails - podcast episode cover

29. Time for British Rail 2.0? & Jacobite steam train fails

Apr 18, 202457 minEp 29Transcript available on Metacast
--:--
--:--
Listen in podcast apps:

Episode description

The Jacobite steam train fails on its first run of the season from Fort William to Mallaig, stopping near Glenfinnan viaduct… and it had Mk 1 carriages on the train. Alstom Derby and the Government are on the verge of doing a deal over a train order for the Elizabeth line – an order that could save the UK train manufacturing facility. Is the East Coast Main Line timetable change heading towards a repeat of the 2018 Thameslink and Northern timetable fiascos?... Leading Richard to ask whether the answer to this and the other challenges facing the industry is a British Rail 2.0. He then shares his own six-point plan for his version of British Rail 2.0. The Railway Industry Association (RIA)) launches a plan to deliver a lower cost, higher performing net zero railway by 2050. And Northern Rail uses classical music to curb anti-social behaviour. Yes, really! Green Signals: Website - http://www.greensignals.org Newsletter - http://www.greensignals.org/#mailing-list Follow: X (Twitter) - https://twitter.com/greensignallers LinkedIn - https://www.linkedin.com/company/green-signals-productions-ltd Instagram - https://instagram.com/greensignallers Credits: Presenters - Nigel Harris (@railnigel on X) & Richard Bowker CBE (@SRichardBowker). General Manager: Stef Foster (@stefatrail)