EP6 Chesapeake Energy Corporation - podcast episode cover

EP6 Chesapeake Energy Corporation

Aug 24, 202142 min
--:--
--:--
Download Metacast podcast app
Listen to this episode in Metacast mobile app
Don't just listen to podcasts. Learn from them with transcripts, summaries, and chapters for every episode. Skim, search, and bookmark insights. Learn more

Episode description

In this episode the DEP team sits down with Patrick Finney, VP of Completions at Chesapeake Energy, to talk about a recent trip to the Marcellus to visit Halliburton’s electric frac fleet.   We discuss some of the obvious benefits of the electric fleet and Patrick shares some of the key stats from Chesapeake’s first pad in PA.  In addition to the Zeus Electric pump that deliver 5,000HP at over 22 bbls/minute, we discuss the other electric components on location as well as the power supply that can be used with this all-electric solution.   Patrick also shares some interesting insights on what  CHK is doing different on the completions side with wet sand completions, electric compression and CNG trucks to haul sand.

For the best experience, listen in Metacast app for iOS or Android