Engineering Resilience: JP Robinette on the Transformative Sites Reservoir Project - podcast episode cover

Engineering Resilience: JP Robinette on the Transformative Sites Reservoir Project

Dec 10, 202454 minEp. 244
--:--
--:--
Download Metacast podcast app
Listen to this episode in Metacast mobile app
Don't just listen to podcasts. Learn from them with transcripts, summaries, and chapters for every episode. Skim, search, and bookmark insights. Learn more

Episode description

JP Robinette, Engineering & Construction Manager for the Sites Reservoir Project, discusses his role in overseeing the construction and management of this innovative 15-million-acre-foot off-stream reservoir. Designed to capture rainfall and runoff from extreme storms, the reservoir will provide a flexible water supply for California's communities, farms, and environment during times of scarcity. Once integrated with the California State Water Project and Central Valley Project, it will improve water management during floods and droughts while delivering key environmental benefits, such as 372,029 acre-feet of water for ecological use, increased Delta freshwater flows, and cold water for salmon in the Sacramento River.

Podcast Recorded on December 5, 2024

For the best experience, listen in Metacast app for iOS or Android