How not to do feasibility studies | #Railnatter 261 - podcast episode cover

How not to do feasibility studies | #Railnatter 261

May 14, 202557 minEp. 260
--:--
--:--
Listen in podcast apps:
Metacast
Spotify
Youtube
RSS

Episode description

We're looking at the proposals for a new line connecting the North Wales Main Line and the Cambrian Coast Line between Bangor and Afon Wen... Are the plans any good? Should they go ahead even if the correct route for a north-south Welsh mainline is at the other side of the country?

Way back in Episode 57 we analysed where any future north-south Welsh railway needed to be, and we fleshed those plans out into the Dragon Line/Llinell Y Ddraig in Episode 116. Let's see how this report aligns with that - or doesn't.

Download the report here: https://www.gov.wales/sites/default/files/publications/2025-02/re-opening-the-bangor-to-afon-wen-rail-line-feasibility-study.pdf

Enjoyed this? Please do consider supporting #Railnatter at https://patreon.com/garethdennis or throw loose change at me via https://paypal.me/garethdennis. Merch at https://garethdennis.co.uk/merch. Join in the discussion at https://garethdennis.co.uk/discord.

You can also buy my book #HowTheRailwaysWillFixTheFuture: https://bit.ly/HowTheRailways

For the best experience, listen in Metacast app for iOS or Android
Open in Metacast
How not to do feasibility studies | #Railnatter 261 | #Railnatter podcast - Listen or read transcript on Metacast