How a Rare Toad Species Stopped a Clean Energy Project - podcast episode cover

How a Rare Toad Species Stopped a Clean Energy Project

Mar 12, 202417 min
--:--
--:--
Download Metacast podcast app
Listen to this episode in Metacast mobile app
Don't just listen to podcasts. Learn from them with transcripts, summaries, and chapters for every episode. Skim, search, and bookmark insights. Learn more

Episode description

In a remote part of Nevada, an energy company is trying to build a climate-friendly power plant—but the plant is being blocked by conservationists and a decades old environmental law. A geothermal plant built atop desert hot springs sits half-completed after the discovery of a new toad species in the area, and an environmental review required by the National Environmental Policy Act, or NEPA. Conservation groups are suing, arguing the plant could drive the toad to extinction. But that seemingly puts them at odds with clean energy advocates in the fight against climate change. Bloomberg Law's Daniel Moore and Andrew Satter visited the site and join our podcast, On The Merits. They discuss the plant, the toad, NEPA, and why these "green-on-green" fights could become common as renewable energy projects expand. Do you have feedback on this episode of On The Merits? Give us a call and leave a voicemail at 703-341-3690.
For the best experience, listen in Metacast app for iOS or Android