How Many Direct Reports Is Too Many? - podcast episode cover

How Many Direct Reports Is Too Many?

Mar 31, 202618 minSeason 1Ep. 396
--:--
--:--
Download Metacast podcast app
Listen to this episode in Metacast mobile app
Don't just listen to podcasts. Learn from them with transcripts, summaries, and chapters for every episode. Skim, search, and bookmark insights. Learn more

Summary

Martin Moore challenges the modern corporate trend of excessively flat structures and large management spans, exemplified by Meta's 50:1 AI team. He explains the fundamental reasons organizations need teams, structure, and leaders, including for direction, talent development, and effective communication. The episode details the significant indirect costs of delayering and provides four practical factors—physical constraints, direct report experience, role uniqueness, and dominant culture—to assess and build a truly effective organizational structure. It emphasizes that while cost-cutting may seem attractive, neglecting leadership leads to predictable chaos and underperformance.

Episode description

Why your direct reports are underperforming and how to turn it around.


What happens when you give one manager 50 direct reports and call it innovation? 


Chaos.


In this episode, I cut through the corporate delusion that flatter structures are better, and I give you the insights to help you confidently build a structure that actually delivers results.


I start with the fundamentals: why organisations need teams, why teams need structure, and why leaders are essential to making both work.


I focus on the main tool of indiscriminate cost cutting: span of control, and I leave you with four practical factors you can use right now to assess whether your own structure is working for you, or against you.


Source Material:


No Bullsh!t Leadership episodes:

Ep.363: Why Your IT Project Will Fail


Fortune article:

Meta’s new AI team has 50 engineers per boss. What could go wrong?


Gallup research:

Span of Control: What’s the Optimum Team Size for Managers?


Wikipedia links:

Division of Labour

Plato

Adam Smith

The Wealth of Nations


LBT link:

Leadership Beyond the Theory


————————


Have you taken our free Leadership Blindspot test?


In just 5 minutes you’ll uncover the hidden leadership habits holding you back.


Get your Blindspot Score and know exactly what to fix before it costs your career!


TAKE THE FREE TEST HERE


————————


You can connect with me at:


Website: https://www.yourceomentor.com


Facebook: https://www.facebook.com/yourceomentor


Instagram: https://www.instagram.com/yourceomentor


Linkedin: https://www.linkedin.com/in/martin-moore-075b001/


Youtube: https://www.youtube.com/@YourCEOMentor


————————


Our mission here at Your CEO Mentor is to improve the quality of leaders, globally. 

✨ If you’ve finished Leadership Beyond the Theory but still find yourself needing a sounding board for the real leadership challenges, applications are now open for the next intake of The No Bullsh!t Leaders Club.


Join Marty, Em, and 90+ high calibre leaders for straight answers, tough conversations, and ongoing support to help you lead at a higher standard: leadershipbeyondthetheory.com/nblc

Hosted on Acast. See acast.com/privacy for more information.

Transcript

The Corporate Delusion of Flat Structures

What happens when you give one manager 50 direct reports and call it innovation? Well it's chaos. In this episode, I cut through the corporate delusion that flatter structures are better, and I give you the insights to help you confidently build a structure that actually delivers results.

Welcome to the No Bullshit Leadership Podcast. In a world where knowledge has become a commodity, this podcast is designed to give you something more. Access to the experience of a successful CEO who has already walked the path. So join your host, Martin Moore, who will unlock and bring to life your own leadership experiences and accelerate your journey to leadership excellence.

Hey there, and welcome to episode 396 of the No Bullshit Leadership Podcast. This week's episode How Many Direct Reports is Too Many? There's a seductive idea that's quietly been taking hold in the corporate world. That layers of management are nothing but overhead, that self managing teams are the future, and that the fewer bosses you have, the more agile and innovative your team becomes. Well it sounds like it should be true, but it's not. It's both.

In this episode, I start with the fundamentals. Why organizations need teams, why teams need structure, and why leaders are essential to making both work. This leads into the discussion on the main tool of indiscriminate cost. Span of control. What really happens when companies blow past their traditional limit of six to twelve direct reports in the name of efficiency? And who pays the price? Is Meta's recent decision to run an AI team at a fifty to one ratio flirting with disaster?

I'm going to examine the real costs of delayering, the ones that don't show up on a balance sheet until it's too late. And I'm going to close with four practical factors that you can use right now to assess whether your own structure is working for you or against you. So let's get into it. Many years ago, a colleague of mine told me about an experiment. He was in the tech industry and he decided to harness the brain power of the best and brightest people he could find.

So he went out and hired a couple of dozen PhDs. All brilliant people with high intellect and deep knowledge in their area of special idea. He figured that if he put these geniuses all in a room together and gave them some broad objectives, they'd find a way to maximize value. You may not be surprised to hear that it was an unmitigated disaster. After a little over a year, he had to shut the experiment down.

He told me it was like herding cats. Everyone went off in a thousand different directions. Massive amounts of activity, exploration and theorising, yet no commercial value whatsoever was harvested from that unit. This is just one story that reinforces so strongly with me why organizations need teams and why teams need structure and why leaders are needed to bring this structure together.

Organizations are called organizations for a reason. They enable resources to be organized into work groups that perform specific functions. This principle is called the division of labour. Now the theory goes all the way back to the Greek philosopher Plato around four hundred BC, but the modern roots are ranked in the work of Adam. His publication from the late eighteenth century, The Wealth of Nations, is still used today. It's a classic.

Division of labor has served us well for centuries and it's going to continue to do so long into the future. It's become part of how we think. And even in the age of AI, we're going to be thinking about what tasks can be given to AI and what tasks have to be divided up amongst the humans.

Five Reasons Leaders Are Essential

Now if you assume that you need division of labour and teams, then you also have to assume that you need someone to lead them. Here are the top five reasons why, in my estimation, leaders are necessary to achieve any sort of team performance. The first reason is that people need direction. Someone has to feed the work to the team and it has to be coordinated with other teams. Individual contributors are typically pretty poor at this. They just want to do shit.

Leaders have access to planning information and other data. They make decisions about resource deployment. And the larger the organization, the greater the complexity of the strategy at the moment. So the more difficult it is to break it down into more manageable elements. The second reason is that organizations need visibility. There has to be some feedback mechanism for results.

Leaders are there to ensure that results match objectives. They have to report on progress, they have to solve problems, and they have to make adjustments on the way through. The feedback loop from the bottom upwards is almost impossible without leaders. The third reason is that talent needs to be allocated deliberately. The highest value work should be allocated to the most capable people. Leaders are in a position to match capability to opportunity.

This also feeds into talent management and workforce planning. Now this stuff doesn't just happen by itself, not to mention the fact that your talent requires development and nurturing if you want to keep it that way. Reason number four The Will of Management needs to be exercised. At the very top of the organization, the leaders know what has to happen in order to create the most value for them.

You don't have to study the psychology of incentives for long to realise that leaders are more likely to execute the will from above than are the lower level workers. Even if you could find a way to incentivise frontline employees it's almost impossible to differentiate their performance in any meaningful way without a leader who makes that assessment. And finally, reason number five, communication needs to be disseminated. The messages from the top have to make it all the way to the bottom.

Email has shown itself to be a very poor method of achieving this. People see the world through the eyes of their direct manager. They don't want something explained by someone four levels up the hierarchy. They want it explained by the person they report to day to day, who they at least have some relationship with. Now when it comes to managing teams, there's a whole bunch of things that simply won't happen unless a leader makes them.

One might even go so far as to say that the self-managing, self-regulating team is an A-grade bull. It was cooked up by executives who were trying to reduce management costs so that they could improve their bonus potential. It was supported by employees who were much happier in the absence of any oversight. And it was perpetuated by leaders who couldn't articulate why they were critical to the functioning of the business.

Quietly and gradually, the commitment to managers and leaders seemed to evaporate.

Span of Control: Theory and Practice

The most recent evidence of not being valued came in the form of an article that I read recently in Fortune magazine, titled, Meta's new AI team has 50 engineers per boss. What could go wrong? Now this brings in the concept called span of control. Traditionally, the accepted span of control was between six to twelve people. In other words, anyone in a leadership position would have between six and twelve direct reports.

This is a pretty good rule of thumb, but there are also some good reasons to break it from time to time. For example, some smaller functions require high-level expertise and strategic skills at the top, even though the number of subordinate functions may be limited. Take the general counsel, the chief lawyer of a large company.

They may be at the senior vice president level. Very senior in the hierarchy, but possibly only two or three direct reports, looking after key service areas or technical discipline. By the same token, a regional manager might have direct reports in quite a few different locations, demanding a span of control even greater than 12. To give you an idea how it should play out, when I was running CS Energy, the spans of control varied greatly from level to level.

The company was generating over one billion dollars in revenue each year. The balance sheet was worth over two billion dollars, but there were only about five hundred full time equivalent staff. As CEO, I had five direct reports from the Operations, which included asset management, finance, energy market trading, commercial and strategy, and corporate services which had legal HR risk and so forth. These five portfolios gave me line of sight to the big value drivers of the business.

Underneath me, my executives had a range of spans, varying from a low of three to a high of nine. And I was pushing the exec with nine to slim it down as he couldn't cover the breadth of that easily. Now knowing that I ran a multi billion dollar company with only five direct reports gives you a little bit of perspective. If you have too few direct reports, the purpose of each level can become blurred. And if you have too many, you can't give each of them the attention they need.

Tech companies have always been a sort of an outlier. They tend to have very large spans of control. Now they'll tell you that this is because tech companies lend themselves to flatter structures. Theoretically, it's a function of the nature of the earth. Collaboration and professional standards are supposedly high. I find this statement fascinating, particularly given the fact that so many technology projects either fail outright or, in the best case, don't deliver the promised benefit.

It's worth going back just for shits and giggles and having a listen to a podcast episode I did last year where I outlined the reasons for this. It was episode three hundred and sixty-three, Why Your IT project will fail. We'll leave a link to that one in the show notes. But I digress. Historically, even the tech sector has considered a span of 25 to be the outside limit. But apparently, Meta has gone to an AI team with a 50-1 ratio.

The theory says that companies are more agile when they have flatters. It streamlines decision making and it positions management closer to the frontline workers and the customer experience. Well that's plausible, but the downside consequences are massive. According to the latest survey from Gallup, in the last year average team size in the US has increased from just under eleven to a little bit over twelve. This represents a 50% increase in team size since Gallup first measured it in 2013.

But it's still the case that two thirds of managers have less than ten direct reports, so the numbers are skewed by a small number of companies that choose to go wild with D layering.

Assessing Your Organizational Structure

There's no doubt that flatter structures save directly. But there are a whole lot of indirect costs too. And just because you can't see them doesn't mean they don't exist. You can't always recognise them immediately, but they become more and more obvious over time. When you think of it in the context of the five reasons why we have organizations and teams in the first place, it's really easy to see the number of ways that this could go wrong.

You'd have a situation where communication between layers actually deteriorates because the leaders who are left don't have the bandwidth to understand everything that's going on below them. Junior employees get overlooked, and they don't receive the necessary development. Line managers burn out because they're so overworked. Good people and bad people alike are left to their own devices. Projects in distress aren't identified until it's too late.

And decision quality deteriorates because there's no higher level impact. Now personally I have no doubt in the value of management, leadership and organisational structure. It's never perfect, but it's better than the alternative, which is predictable chaos. Companies prove to be highly resilient to the shit decisions that their boards and management teams make. But anyone who thinks that removing layers of leaders doesn't have an impact is living on borrowed time.

I want to give you four key factors that you can weigh up in determining how your structure should look and how many direct reports you should. The first factor is the physical constraint. Are you running teams in different locations? If so, having a direct report from each location often makes sense. But once you start to get to 8 to 10 locations, say, you should probably consider putting in a span bracket. Now what does that mean?

Let's say I'm an operational manager in Sydney. I might have 15 store locations that sit underneath me. I could potentially use a couple of area managers to oversee some of the smaller stores. This way I could turn fifteen reports into say seven. Two area managers, each with five smaller stores underneath them, and the five big flagship stores still reporting directly to me. The second factor is the experience of your direct. It matters what level you're operating.

Now using my CS Energy example, my five direct reports were all capable, experienced, senior leaders. were independently competent and they required less oversight from me as their direct manager. However, this also demanded that I spend significant time with each one to make sure they were getting the direction, support and guidance they needed from me to keep their teams moving. Less experienced reports at lower levels will need even more handholding on the basics.

The third factor is the uniqueness of the role itself. In organizational design, there are a few rules of thumb. Each layer must have a unique purpose. Each layer must produce a unique set of deliverables, and each layer must focus on a unique time horizon. If you apply these principles, you'll find out pretty quickly what's wrong with your strategy.

It doesn't necessarily mean you should have like the span breaker area managers I mentioned before, but it certainly forces you to consider why your structure is the way it is. In the meta example, I suspect that the amount of ground that needs to be covered by only two layers is Fifty technology gurus and one manager is unworkable. In cases like this, what typically happens is that the results become more dependent on individual performance.

Some people are going to find a way to make it work, and others are simply going to flounder. But with such a large span of control, you've got no chance of catching an imminent catastrophe before it hits. The fourth and final factor is the dominant culture. The culture of the company is going to largely determine what's acceptable in terms of structure. In meta, I suspect you wouldn't get very far if you suggested that each of your leaders should have a maximum of five directors.

It may even be a career-limiting move. And there are other cultural factors as well of course, like how much a leader is expected to dip down and work on the tool. To what extent is decision making either centralized or decentralized? Are decisions pushed down to the lowest practical level at which they can be made? How strong are the single point accountability structures? And is a bias for action and individual independence valued inside the culture.

Understanding the barriers and expectations is the first step. The second step is to push your span of control as far as the culture will let you, and then make the case for going even further. If you don't have the right number of direct reports, you're not going to be able to give each of them the attention they need to bring out their best performance. So you've got to be really clear on how you're going to make that happen as a leader.

Vague notions of why you think you need either fewer or more direct reports simply aren't going to cut it. You've got to be able to clearly articulate the value that might come from any structural change. To make any structure work, you need strong leadership and a constructive high performance culture. And you can't achieve that unless you've got the bandwidth to spend with your director.

Alright, that brings us to the end of episode three hundred ninety six. I really hope you enjoyed it, but as I'm sure you know, listening is easy, leading is easy. That's why we created Leadership Beyond the Theory, our flagship program that turns insight into action and action into results. This is where we unlock the secrets of elite leadership performance and give you the tools that you need to lead at the right level.

I'm looking forward to next week's episode where I'm going to do a QA with M. Till then, I know you'll take every opportunity you can to be a no bullshit leader.

This transcript was generated by Metacast using AI and may contain inaccuracies. Learn more about transcripts.
For the best experience, listen in Metacast app for iOS or Android