Expanding the Footprint: Pirate Gold’s Large-Scale Alteration System at Crippleback Lake
May 11, 2026•23 min
Episode description
Pirate Gold recently announced that drilling has expanded a large alteration system at its flagship Crippleback Lake project in Newfoundland. CEO Denis Laviolette spoke to Mining Stock Daily to discuss how these latest results confirm the presence of a robust hydrothermal system linked to the regionally significant Valentine Lake Fault Zone. Laviolette said there is widespread alteration, strong sulphide development, and a system that is just beginning to take shape.
For the best experience, listen in Metacast app for iOS or Android
