HRBT Tunnel Talk - podcast cover

HRBT Tunnel Talk

Virginia Department of Transportation (VDOT)hrbtexpansion.org
HRBT Tunnel Talk follows the Hampton Roads Bridge Tunnel Expansion Project in Virginia.  It is the largest ever construction project for the Virginia Department of Transportation. The series will explore funding, construction, employment opportunities, tunnel technology and benefits to the Commonwealth of Virginia.
Last refreshed:
Follow this podcast in the Metacast mobile app to refresh it and see new episodes.
Download Metacast podcast app
Podcasts are better in Metacast mobile app
Don't just listen to podcasts. Learn from them with transcripts, summaries, and chapters for every episode. Skim, search, and bookmark insights. Learn more

Episodes

Summer Camp at the HRBT Welcome Center

The HRBT Welcome Center is rolling out the welcome mat to school-age children attending summer camps across Hampton Roads. Students are enjoying STEM and project-related learning from HRBT Expansion staff.

Jul 09, 202517 min

FIVE YEAR SUCCESS STORY: BIRD MONITORING AT HRBT EXPANSION PROJECT

Sunshine, surf and favorite eating spots bring more than just tourists to Hampton Roads from April through September. That’s when nesting, state-threatened and migratory birds are active in and around the Hampton Roads Bridge-Tunnel. For five years, bird monitors have been on duty to make sure the birds and the commonwealth’s largest construction project can peacefully co-exist. Learn more about the monitors’ work in the latest edition of HRBT TUNNEL TALK.

May 30, 202520 min

Monitoring the Invisible Measurements

Sean Johnson has a keen eye out for movement and unforeseen changes at the HRBT Expansion Project. In this installment of HRBT Tunnel Talk, hear Sean explain how he relies on “invisible” measurements to help detect changes in and around the construction environment.

Apr 08, 202524 min

Meet the Visionaries: The Engineers Driving the HRBT Expansion

National Engineers Week in February celebrates the amazing accomplishments of talented men and women who improve the quality of our lives. The HRBT Expansion Project that includes many talented engineers. In this edition of HRBT Tunnel Talk, we meet four individuals transforming transportation in Virginia.

Feb 25, 202531 min

Barges, Tugs, Boats and Bridges

Barges, tugs, boats and bridges. The HRBT Expansion Project team coordinates it all. And the Team brings an impressive portfolio of experience to the project, including work in New York City, post 9-11. Learn more about managing the maritime works of the expansion project in the latest installment of HRBT Tunnel Talk.

Dec 23, 202432 min

Environmental Permitting

A new bridge-tunnel project like the HRBT Expansion starts with environmental permitting. And for this project, there are more than 22 permits that require various levels of approval and constant monitoring. That responsibility for VDOT falls with Larissa Ambrose, the project’s environmental manager. In this edition of HRBT Tunnel Talk, we learn from Larissa about the many challenges of her job.

Nov 11, 202432 min

The new HRBT Expansion Project Welcome Center

The HRBT Expansion Project is rolling out the welcome mat to the public. The project has an official Welcome Center which will soon be open for STEM learning, community engagement and meetings, tunnel history and more! Tune into HRBT Tunnel Talk for details on what you can expect to find at the HRBT Welcome Center.

Oct 07, 202416 min

Hampton Roads Express Lanes Network

HRBT Expansion Project Communications Director Paula Miller is joined by Project Director Ryan Banas, VDOT District Engineer Chris Hall, and HRTAC Executive Director Kevin Page on this episode that provides an overview of the Hampton Roads Express Lanes (HREL) network, a continuous 45-mile network of Express Lanes on I-64, extending from west of Denbigh Boulevard in Newport News to the I-264/I-664 Bowers Hill interchange in Chesapeake, providing enhanced travel options to accommodate the future ...

Sep 12, 202427 min

Uncovering Archeological Discoveries on the HRBT Expansion Project

HRBT Expansion Project Communications Director Paula Miller is joined by Project Director Ryan Banas for an update on the project, along with archeological experts David Lewes, Co-Director of William and Mary’s Center for Archeological Research, Adam Pritchard, Virginia Museum of Natural History’s Assistant Curator of Paleontology, and Will Moore, Virginia Department of Transportation’s Lead Archeologist. Learn about the historic and prehistoric finds, from shipwrecks to mastadon bones.

Jul 10, 202430 min

Women in Maritime Construction

To celebrate International Day for Women in Maritime, the latest episode of HRBT Tunnel Talk features two project engineers, Linh Do and Sophia O'Brien, to talk about island expansion and bridge rehabilitation, while Project Director Ryan Banas provides an update on the project.

May 17, 202434 min

Mary is So Boring! Learn about progress on the new tunnel.

HRBT Tunnel Talk Host Brooke Grow is joined by Project Director Ryan Banas who provides an update on the progress across the project. Podcast guest, HRCP Project Manager Louis Brais provides the 411 on the progress of Mary, the Tunnel Boring Machine, under the channel as she works to construct VDOT's first bored tunnel for the HRBT Expansion Project. Who knew that boring could be so exciting?

Jan 09, 202446 min

Coordinating Construction in Hampton

HRBT Expansion Project Communications Manager, Brooke Grow, provides an update on the construction progress. Special guests include VDOT District Senior Communications Specialist, Nina Ullrich, and City of Hampton Communications Strategist, Robin McCormick, to discuss the collaboration needed to coordinate multiple construction projects in Hampton.

Nov 20, 202324 min

Environmentally Speaking

HRBT Tunnel Talk Host Brooke Grow is joined by new Project Director Ryan Banas who provides an update on the project. Then Brooke explores the environmental aspects (fish and turtles and birds, oh my!) of the project with guests Larissa Ambrose, VDOT Environmental Manager, and Becky Gwynn, Executive Deputy Director of the Virginia Department of Wildlife Resources.

Jun 21, 20231 hr

The Role of the Slurry Treatment Plant PART 2

Learn more about the ins and outs of Katherine the Slurry Treatment Plant (STP). HRBT Tunnel Talk Host Brooke Grow is joined by HRCP's Ancillary Equipment Manager Javier Fernandez, as well as TBM and STP Manager George Mizzi. They'll discuss how Katherine interacts with Mary the TBM to excavate and create the new tunnels.

May 05, 202315 min

The Role of the Slurry Treatment Plant - Reuse, Recycle, Reduce

Learn more about Katherine the Slurry Treatment Plant (STP), the counterpart to Mary the TBM in the tunnel boring process. HRBT Tunnel Talk Host Brooke Grow is joined by HRCP's Ancillary Equipment Manager Javier Fernandez, as well as TBM and STP Manager George Mizzi. They'll describe the STP and provide an overview of how Katherine works.

Mar 01, 202330 min

Kids Ask 'Boring' Questions

Ever wonder what goes on in the mind of a child? Now, you can hear it firsthand. Communications Manager Brooke Grow and Staff Engineer Philip Casteen answer a myriad of colorful and creative questions that kids have about the HRBT Expansion Project.

Nov 16, 202222 min

Regionalism and Transportation Funding

With a price tag of $3.9 billion, the HRBT Expansion Project was a huge undertaking made possible through regional cooperation. Catch up on project progress with Project Director Jim Utterback and hear about regional transportation funding from the Honorable Mayor Donnie Tuck of Hampton, and chair of the Hampton Roads Transportation Accountability Commission.

Sep 23, 202226 min

Reassembling Mary the TBM

In this episode, Project Director Jim Utterback shares an update on the project and HRCP's Carlos Ramo provides insight into what goes into reassembling Mary, the Tunnel Boring Machine.

Aug 22, 202236 min

What to Expect this Summer: Lane Closures Ahead

What does an Olympian have to do with the HRBT Expansion Project? Find out on this episode. Project Director Jim Utterback provides a project update, while VDOT's Bradley Weidenhammer and HRCP's Brian Ballard share planned construction activities, lane closures and tips for traveling through the project corridor. Plus, find out how you can take part in future podcasts!

Jul 20, 202225 min

Casting A New Tunnel

In this episode, meet Brooke Grow, the new host of this boring podcast, get an update from Project Director Jim Utterback, and learn about how the new tunnel is currently being constructed from Hampton Roads Connector Partners' Aurelien Gil.

Jun 03, 202231 min

HRBT Tunnel Talk Young Professionals

Project Director Jim Utterback provides an update on the progress of the project. Hear from two young professionals about their career in transportation and their path to the HRBT Expansion Project.

Nov 29, 202121 min

DBE/SWaM Resources

In this episode, hear about the project's progress from Project Director Jim Utterback and learn about opportunities and resources for small, women and minority owned businesses from VDOT Civil Rights Manager Queen Crittendon and HRCP Compliance Manager Malcolm Kates.

Oct 15, 202135 min

HRBT Tunnel Talk Safety

Project Director Jim Utterback gives a project update and Virginia State Police Sgt. Michelle Anaya and HRCP's Jeff Singleton join the podcast to provide valuable safety information for motorists traveling through the project corridor.

Sep 08, 202129 min

HRBT Tunnel Talk Summer Construction

With summer comes increased construction activities to widen I-64 between Settlers Landing Road in Hampton and the I-564 interchange in Norfolk. In this episode, HRCP Communications Manager Steve Meyers will share details about the construction activities planned along the project corridor and the tools that can help you navigate the impacts.

Jul 08, 202111 min

HRBT Tunnel Talk Marine Construction

In this episode, hear from Project Director Jim Utterback on increased construction activities and Project Manager Rob Gianna shares an overview of the marine construction activities, including the marine trestle bridges that connect the islands with the mainland. Please subscribe to our podcast!

Jun 10, 202121 min

HRBT Tunnel Talk North Island Reclamation

In this episode, we get an update from Project Director Jim Utterback and Project Manager Megan Pym explains the North Island expansion process. Be sure to subscribe to our podcast for further updates.

Apr 21, 202116 min

Naming the TBM (Tunnel Boring Machine) Contest

A Tunnel Boring Machine (TBM) will bore twin tunnels next to the existing Hampton Roads Bridge-Tunnels as part of Virginia’s largest-ever construction project. And, the big, bold machine will get a name before it comes out of final production. The Virginia Department of Transportation (VDOT) has launched a TBM Naming Contest aimed at school age children On this next installment Of HRBT Tunnel Talk, we learn more about how the machine will get its name. Be sure to subscribe to this podcast.

Oct 16, 20205 min

Preparing for the TBM

As the Design-Builder for Virginia's largest construction project awaits Notice to Proceed, early work is underway on the Hampton Roads Bridge-Tunnel Expansion Project. The South Island is percolating with activity to prepare the island for the massive Tunnel Boring Machine (TBM) which will bore twin tunnels parallel to the existing tunnels. In the latest installment of HRBT Tunnel Talk, Paula Miller talks with Project Director Jim Utterback about the significant effort it takes to obtain such a...

Jul 30, 202017 min
Hosted on Libsyn
For the best experience, listen in Metacast app for iOS or Android