episode 17 - NRCM vs CMP - podcast episode cover

episode 17 - NRCM vs CMP

Mar 05, 202130 min
--:--
--:--
Listen in podcast apps:
Metacast
Spotify
Youtube
RSS

Episode description

Sue Ely, Climate and Clean Energy Policy Advocate and staff attorney for the Natural Resources Council of Maine explains why NRCM believes Central Maine Power’s 145 mile high voltage transmission line, a project planning to carve a 150 wide path through the Maine North woods in order to transfer Canadian hydro power to Massachusetts is a bad deal for Maine.
For the best experience, listen in Metacast app for iOS or Android
Open in Metacast
episode 17 - NRCM vs CMP | Grit podcast - Listen or read transcript on Metacast