Master The NEC - Let's FINISH Fire Pumps and Article 695 - Part 5 - podcast episode cover

Master The NEC - Let's FINISH Fire Pumps and Article 695 - Part 5

Sep 29, 202043 min
--:--
--:--
Download Metacast podcast app
Listen to this episode in Metacast mobile app
Don't just listen to podcasts. Learn from them with transcripts, summaries, and chapters for every episode. Skim, search, and bookmark insights. Learn more

Episode description

Join us as we finish up the chat on fire pumps and article 695 of the National Electrical Code. We have looked at sizing, routing, components, and power supply conductors and feeders in this 5-Part series. We end it with voltage drop and control wiring.

---

This episode is sponsored by
· Anchor: The easiest way to make a podcast. https://anchor.fm/app

---

Send in a voice message: https://anchor.fm/electricianlive/message
Support this podcast: https://anchor.fm/electricianlive/support

Become a supporter of this podcast: https://www.spreaker.com/podcast/electrify-electrician-podcast--4131858/support.
For the best experience, listen in Metacast app for iOS or Android