Murrumbidgee Irrigation v M & H Acar [2019] NSWSC 807

Jul 22, 20195 min
--:--
--:--
Download Metacast podcast app
Listen to this episode in Metacast mobile app
Don't just listen to podcasts. Learn from them with transcripts, summaries, and chapters for every episode. Skim, search, and bookmark insights. Learn more

Episode description

Our plaintiff, P, is an irrigation company. It owns pipes.  

One pipe is on D’s property. P is the beneficiary of an easement for it.  

D wanted to develop the site, including putting a driveway over the pipe. P’s engineer assessed the risk of the driveway damaging the pipe to be high: [14].  P demanded that all works cease and received no substantive reply.  

P sought an interlocutory injunction to prevent D performing works on the land. D, essentially, consented.  

The outstanding issue? Costs.  UCPR 42.19 says, usually, a plaintiff who discontinues must pay the defendant’s costs.  

P sought its costs arguing (i) it had no choice but to commence proceedings, (ii) D had acted unreasonably, and (iii) P had been substantially successful: [26].  The Court found it was unreasonable for D not to respond to P’s demand: [58]. 

If D had said it was prepared to change the DA then the costs would have been avoided: [59].  This was so unreasonable as to merit a costs order in P’s favour.