Cedar LNG, Haisla Nation, and Pembina Pipeline: Canada's First Indigenous-Led LNG Project - podcast episode cover

Cedar LNG, Haisla Nation, and Pembina Pipeline: Canada's First Indigenous-Led LNG Project

Oct 22, 202443 minSeason 1Ep. 257
--:--
--:--
Download Metacast podcast app
Listen to this episode in Metacast mobile app
Don't just listen to podcasts. Learn from them with transcripts, summaries, and chapters for every episode. Skim, search, and bookmark insights. Learn more

Episode description

On June 25th, 2024, Cedar LNG announced a positive final investment decision (FID) for a floating liquefied natural gas (FLNG) facility with a nameplate capacity of 3.3 million tonnes per annum (~0.4 Bcf/d) located in the traditional territory of the Haisla Nation, near Kitimat, British Columbia, on Canada’s west coast. Commercial operation is expected by 2028, and the project will use the existing Coastal GasLink pipeline (also serving LNG Canada) to deliver natural gas from the production fields in British Columbia and Alberta. The project has an estimated cost of US$4 billion and will be majority-owned by the Haisla Nation. Their partner is Pembina Pipeline Corporation.

This week, our guests are Crystal Smith, Chief Councillor of the Haisla Nation, and Scott Burrows, President and Chief Executive Officer of Pembina Pipeline Corporation. They explain the project, the community support, the financing, the environmental review process, and, importantly, what this project means for the Haisla Nation’s economic future.

Other content referenced in this podcast:

Please review our disclaimer at: https://www.arcenergyinstitute.com/disclaimer/  

Check us out on social media: 

X (Twitter): @arcenergyinst
LinkedIn: @ARC Energy Research Institute 

Subscribe to ARC Energy Ideas Podcast
Apple Podcasts
Amazon Music
Spotify 

For the best experience, listen in Metacast app for iOS or Android